Chinese translation for "loading period"
|
- 载荷周期
Related Translations:
period: n.1. 时代;期;时期;期间;阶段。2.〔the period〕现代,当代。3.周期;【地质学;地理学】纪。4.终结;句号。5.【语法】长复合句,圆周句;【修辞学】掉尾句。6.〔pl.〕美词丽句;华丽的词藻。7.学时,课时,一节课;(比赛的)一节时间。8.【医学】过程,周期。9.〔pl.〕月经(期)。10.【数学】(循环小数的)循环节。11.【音乐】乐段。短语和例子the
- Example Sentences:
| 1. | You should cable us the vessel name , estimated loading period , loading capacity , contract number , shipping agent to us 12 days before loading time 你方应在船只受载期12天前将船名、预计受载期、装载量、合同号、船舶代理人电报告知我们。 | | 2. | The result provides efficiency decision - making basis for the operation mode of chongqing power network during low load period , and has important economic and social benefits 论文成果为重庆电网低谷时段运行方式的确定提供有效的决策依据,具有重要的经济效益和社会效益。 | | 3. | Owing to the rapid increase of local load and the intrinsic defects of equipment , during the peak load period in 2004 many faults occurred in the low voltage urban distribution network 摘要由于局部负荷快速增长和设备本身存在的缺陷, 2004年负荷高峰期间,黄石城区低压配网发生了多起故障。 | | 4. | According to the problem of over - voltage in chongqing power network during the low load period , this paper has a study on voltage and reactive power of the system power network 论文针对重庆电网低谷时段主网电压过高问题,对系统电网电压和无功进行深入系统的研究,提出了解决方案,使得重庆220kv电网低谷电压控制在232kv以下。 | | 5. | And a solve scheme is presented , controlling the voltage of 220kv power network in chongqing under 232kv during low load period . with the increase of load and power supply , the reasonable positions and capacitance of reactive power compensation become reasonless 随着负荷的不断增加,电源亦随之大幅度增加,使得原网络中本来合理的补偿位置、补偿容量变得不合理,因此有必要重新选择补偿点。 | | 6. | It is discussed that the load period , the damp ratio of pavement , the temperature of asphalt concrete , the resilient modulus of semi - rigid base , the material parameters and thickness of the composite foundation have influence on the dynamic stress intensity factor and the vertical displacement 探讨了荷载周期、道路结构体的阻尼比、沥青混凝土的温度、半刚性基层的回弹模量、复合地基的材料参数和厚度对动应力强度因子、特征点的竖向位移变化规律的影响。 | | 7. | According to the problem of over - voltage in chongqing power network during the low load period , this paper had a thorough research on voltage and reactive power of the system power network by means of calculation , analysis and experiments . and a solve scheme was presented and implemented , controlling the voltage of 220kv power network in chongqing under 232kv during low load period 本文针对重庆电网低谷时段主网电压过高问题,通过计算、分析、试验等手段对系统电网电压和无功进行全面的分析研究,提出解决方案并实施,使重庆220kv电网低谷电压控制在232kv以下。 | | 8. | It is discussed that the load period , the damp ratio of pavement , the temperature of asphalt concrete , the resilient modulus of semi - rigid base , the material parameters and thickness of the composite foundation have influence on the vertical displacement , the radial stress of the base bottom and the sub - base bottom 具体探讨了荷载周期、道路结构体的阻尼比、沥青混凝土的温度、半刚性基层的回弹模量、复合地基的材料参数和厚度对特征点的竖向位移、基层和底基层层底径向应力的影响。 |
- Similar Words:
- "loading pan" Chinese translation, "loading parasitic" Chinese translation, "loading path" Chinese translation, "loading pattern" Chinese translation, "loading performance" Chinese translation, "loading permit" Chinese translation, "loading pier" Chinese translation, "loading pigment" Chinese translation, "loading pigments" Chinese translation, "loading pipe" Chinese translation
|
|
|